FEATURED PROJECT / IN PROGRESS
Sporthal Langemark
A look at ongoing technical work: from air distribution to lifting the rooftop installation.
View project ↗EDUCATION / CHILLED WATER
Hydraulic prefabrication, chiller and insulated pipework for one campus project.

THE PROJECT AT A GLANCE
For HOGENT campus De Wijnaert, workshop preparation comes together with rooftop installation. The images show placement of the chiller and hydraulic module in December 2025, followed by a detail of insulated pipework in September 2026.
TECHNICAL SCOPE
Tell us about your building, process or installation. We discuss the application, existing situation and what you want to achieve.
Discuss your project ↗ENGINEERING IN FIGURES
| Component | Specification | Application & conditions |
|---|---|---|
| Chiller | Carrier AquaSnap 30RB-140R | Air-cooled chiller for cooling operation |
| Refrigerant | R32 | Confirmed in the selection and commissioning report |
| Cooling capacity | 135 kW | Outdoor air 35°C · water entering 12°C → leaving 7°C |
| Buffer vessel | 2,000 litres | Presence confirmed at commissioning |
IN PICTURES
Click an image to enlarge it.
Workshop and site photos: Ameel project archive · December 2025 and September 2026.
FROM YOUR FIRST QUESTION TO A FOCUSED PROPOSAL